16th November 2010

Posted: November 18, 2010 in BA (Hons) Digital Media Production, Specialist Project

I headed down to Swanage Monday evening to prepare for an early start Tuesday morning. I wanted to prepared to finish all the filming that needed to be done at Paul’s house. I wanted to start filming promptly at 10:30 – 11:00, but due to unforeseen circumstances we didn’t start till after lunch. We managed to wrap up filming at Paul’s for the end scene at about 3:00pm, once that was finished we worked on loading the car with the monitors and second table along with all the equipment down to the coast. It took about 3 trips but we did it in the end, however I thought the table was a fold out but it turned out that it needed bolts.

So by the time everything was set up it was about 5:00pm which I thought would have been fine for lighting but it was to dark. I could have shot some footage but I wanted it to look how I envisioned the final piece to look like. So reluctantly, we packed everything away and got it by to Paul’s house. Luckily the day wasn’t a complete waste of time and we managed to shoot the final couple of shots I needed at Paul’s house, including the tracking for Paul’s forehead for the monitor.  I returned the equipment Wednesday afternoon and re booked it for Tuesday next week so hopefully that wil be the last of the filming and in the mean time I can get down to work on the main edit.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s